The foundation for our new Administration & Education Building was laid on September 13. We used 12 trucks of concrete. Each truck carried 10 cubic yards of concrete for a total of 120 cubic yards. The perimeter wall was built with 45 cubic yards of that total. All that was poured on 26 bell-bottomed piers which extended 13 feet into the ground. All in all, a solid foundation!